Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 27, 2022     Wingtip rib nutplates - (3 hours)       Category: Wings
Fabbed a wooden hinge pin stop. The final product will be a delrin or plastic block that will secure the aft end of the pins to keep the pin from vibrating out. Fit check the right wingtip rib into the wingtip to check and trim the hinge pins. Finalized location of hinge pin anchor block and marked for screw and nutplate. Drilled both ribs for #10 nutplates. Will wait to drill hole to final size and match drill to anchor block.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.